# REO Step 4: Requirements Begin to Scale with Stake

**URL:** <https://forum.thegraph.com/t/reo-step-4-requirements-begin-to-scale-with-stake/7133>\
**Category:** General\
**Tags:** indexer\
**Created:** [November 5, 2026, 2:39pm UTC](https://forum.thegraph.com/t/reo-step-4-requirements-begin-to-scale-with-stake/7133 "2026-11-05T14:39:19Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![brandonkramer](https://sea2.discourse-cdn.com/flex020/user_avatar/forum.thegraph.com/brandonkramer/32/1336_2.png) [@brandonkramer](https://forum.thegraph.com/u/brandonkramer)\
**Post date:** [November 5, 2026, 2:39pm UTC](https://forum.thegraph.com/t/reo-step-4-requirements-begin-to-scale-with-stake/7133/1 "2026-11-05T14:39:19Z")

</div>

The Rewards Eligibility Oracle (REO) is moving to its next step. From **Tuesday, November 17, 2026** , the number of Subgraphs an Indexer must serve each online day depends on its total stake. The change was announced at Graph Office Hours on November 3, 2026, which gives the 14 days’ notice that every REO change gets.

### **Where REO is Today**

The first three steps set a baseline threshold all Indexers need to meet. REO reduced the number of Indexers that received indexing rewards that were not providing value to the network. Every eligible Indexer now serves qualifying queries on at least 10 Subgraphs. Moving forward, that minimum will remain for all Indexers.

### **What Changes**

The next phase of changes aim to match work to rewards based on stake. Indexing rewards depend on stake, and stake is concentrated: the 10 largest Indexers hold about 70% of total stake and they received about 71% of the indexing rewards paid from August 2 to October 29. The Indexers that receive the most rewards should give the most value.

**End goal:** The Foundation’s eventual aim is to require Indexers to serve one qualifying Subgraph for each 1M GRT of total stake. For example, an Indexer with 100M GRT serves queries on at least 100 Subgraphs. The ratio rises toward this goal in steps, so Indexers can add capacity gradually.

**Step 4 starts on November 17:** All Indexers are required to (a) serve one Subgraph for every 4M GRT in total stake or (b) serve at least 10 qualifying Subgraphs. In essence, this only changes the requirement only for Indexers with more than 40M GRT total stake. Here is a table that outlines the proposed impact on Indexers of different sizes:

| Total stake | Today | Step 4 | End goal |
| --- | --- | --- | --- |
| 30M GRT | 10 | 10 | 30 |
| 50M GRT | 10 | 13 | 50 |
| 100M GRT | 10 | 25 | 100 |
| 200M GRT | 10 | 50 | 200 |

### **Two Clarifications**

- First, total stake refers to the aggregate of an Indexers’ self-stake and the total amount of GRT delegated to that Indexer.
- Second, the Subgraph count refers to the number of Subgraphs an Indexer serves qualifying queries on, not simply Subgraphs that it syncs. Indexers also follow curation signal (and eventually DIPs), so they usually sync more Subgraphs than they serve. Indexers should plan to sync capacity with headroom above their baseline.

### **What Stays the Same**

- Indexers still need to be online for 5 or more days in a rolling 28-day window
- A qualifying query returns HTTP 200, responds in under 5,000 ms, and comes from an Indexer within 50,000 blocks of chainhead
- Eligibility renews on-chain daily at 10:00 UTC and lasts 14 days from renewal

Each daily run checks every day in the 28-day window against the current minimum. Eligibility already renewed before November 17 stays valid for the rest of its 14-day period. Each later step will be announced with at least 14 days’ notice and the data behind it, in the criteria document and at Graph Office Hours.

### **Actions Before November 17**

1. Indexers should work out their number: total stake ÷ 4M GRT (rounded up) with a minimum of 10.
2. Indexers must count the distinct qualifying Subgraphs that are **served** each day.
3. If Indexers are below their number, they must allocate to and sync more Subgraphs.
4. Plan capacity toward the end goal – not only Step 4.

Graph Office Hours from November 3: [https://www.youtube.com/watch?v=fimDRdL1Zsk](https://www.youtube.com/watch?v=fimDRdL1Zsk)

REO: Two-Month Retrospective: [https://thegraph.com/blog/reo-two-month-retrospective/](https://thegraph.com/blog/reo-two-month-retrospective/)

Indexers can check their status on the REO dashboard: [https://reo.thegraph.com/](https://reo.thegraph.com/)

Criteria and changelog: [https://github.com/graphprotocol/rewards-eligibility-oracle/blob/main/ELIGIBILITY\_CRITERIA.md](https://github.com/graphprotocol/rewards-eligibility-oracle/blob/main/ELIGIBILITY_CRITERIA.md)

### Questions for this thread

- What do you need from the dashboard or the criteria document to plan for Step 4?

- How should later steps treat Indexers that specialize in a few chains or Subgraphs?
